Skip to main content

Posts

Showing posts from December, 2023

Supporting Richard Alibon School

Christmas is a time for sharing and considering others - MSK were proud support the Richard Alibon School again this year and send the children some Christmas joy and fun!

MSK FP Team In Action

With ongoing strip out works across roof and basement areas and removal works ongoing for M/E items, the MSK FP Team are displaying their expertise at this busy city project develops. Scope of works includes full shell and core strip out across roof, basement, and levels LG-9. Works include removal of plasterboard/glazed partitions, high- and low-level services, raised access floor and finishes, tea points, fixtures/fittings, comms rooms. The MSK FP Team have removed three DRUPs engine units from the roof areas, this included the removal of engines, frame, couplings, and full enclosure removal. The waste from this was then weighed and secured to pallets so it could be removed via a goods hoist and then slung via the gantry beam hoist. Great work team.

Victoria Project Delivery

A small MSK Team of three managing the 13th floor have assisted in the delivery of this stunning Victoria project. Works included vehicle management, waste management, welfare, general labour, carpentry, and protection. Albeit a small team, Logistics Manager Rui Lopes was recognised early for his efforts managing this project, ensuring health and safety for all operatives was adhered to throughout. Rui controlled the project delivery management system and helped with the smooth delivery of all contractor’s materials, aiding the completion of the project on time .